Condition monitoring for shot blasting machines: a case study
Read how SAM4 caught a loose blast wheel belt guard before it caused damage to this steel manufacturer's shot blasting machine.
Failure mode
A loose belt guard in one of the blast wheels disturbed the operation of that blast wheel and its neighbor.
How SAM4 helped
SAM4 flagged a sudden spike at the rotational frequency for two of four blast wheels in this shot blasting machine. In the days that followed, the intensity continued to rise for both wheels. The machine’s other two blast wheels showed no such trend. The customer inspected both wheels five weeks later, during a planned maintenance stop. The belt guard on one of the blast wheels had come loose; there was no visible problem on the other. The customer tightened the belt and replaced the damaged belt guard on the faulty wheel, after which both machines returned to normal operation.
Outcome
“SAM4 kept us from overlooking parts that needed attention but weren’t originally scheduled for inspection during this stop.”
The intensity at the rotational frequency over time, for each of the two blast wheels. The black dots in the bottom graph are for the wheel with the loose belt guard. The blue dots in the top graph are for its neighbor, which had no obvious faults upon inspection. We first alerted the customer at the orange line; they performed maintenance at the green line. Fixing the issues with the first blast wheel returned both wheels to normal operation.
See SAM4 in action
Related case studies

Loose cardan joint caught the same day SAM4 was installed
Read how SAM4 caught a loose cardan shaft coupling within hours of installation on this long-term steel customer's runout table roll.

Early warning on failing cardan shaft coupling in runout table roller
Read how SAM4 caught a failing cardan shaft coupling in a runout table roll for this steel manufacturer.

Bearing failure avoided in motor driving critical runout table roll
Read how SAM4 caught motor bearing failure in a runout table roll 7 months in advance for this steel manufacturer.