Detection story
Rightsizing booster pumps to save €121k a year in wasted energy
SAM4 Energy identified a classic mismatch between pump size and system flow that was annually consuming 813 MWh more than it needed to.
Problem
SAM4 Energy was installed on three 450 kW booster pumps that ran simultaneously in a chemical production process. After analyzing the pumps’ operational data, SAM4 identified consistently suboptimal performance on the far left of the pump curve for all three pumps. This not only wasted energy; it also sped up wear and tear on the pumps, which if sustained would increase the need for maintenance and repairs and ultimately shorten the pumps’ lifetime.
All three pumps spent most of their time operating well away from their best efficiency point, in an area of the pump curve known to cause cavitation and shorten seal and bearing life (in addition to wasting significant energy).
Solution
This operational behavior, with each pump running at only 56% of its rated power, suggested that the pumps were oversized for the system’s desired flow. Our Energy team advised the customer to perform a life cycle analysis, comparing the capital expense, operational expense, and maintenance cost of correctly sized, more efficiently designed pumps to the cost of the existing pumps’ energy consumption, operational losses, maintenance costs and probable shorter lifetime.
Savings
Once implemented, the installation of pumps with best efficiency points closer to system duty will save the customer up to 349 metric tons in carbon emissions and €121,000 in wasted energy per year.
See what SAM4 can detect on your assets
Related case studies

Early alerts prevent a potential pollution event and save ~€200K in costs at Yorkshire Water
A sewage pump failing during high flow floods the surrounding area. SAM4 flagged the developing fault in time for the repair to be planned.

Wastewater inlet station energy cost reduced by €42k per year
Two screw pumps were running at under a third of nominal power. SAM4 Energy showed a single pump could carry the flow for most of the day.

How Vitens increased operational efficiency by 7% through real-time asset measurements
Three booster pumps at the largest water utility in the Netherlands had lost 10% efficiency. Real-time measurement showed exactly where it had gone.

Alert prevents pollution incident and saves €100k
The customer's own vibration system saw nothing. SAM4 picked up the developing fault on the sewage pump and the repair was made before it failed.
Samotics' clogging detection technology identifies a blockage outside of the pump
The load signature pointed away from the pump itself. The blockage sat outside it, and the operator cleared it before high flow made it a pollution risk.

Condition monitoring for wastewater pumps: a case study
Read how SAM4 alerted this water industry customer to debris that had started to block this wastewater collection pump's intake.